Storm Water Study

A comprehensive study of the existing storm water system in the City of Beaverton. The results will inform future improvement projects and long-term infrastructure planning.

Overview

Grant: CDBG

Anticipated Completion: Winter 2026

Project Engineer: MLR Engineering