Trail of Two Cities

This project began with a vision and a Master Plan in 2014 and involves the construction of the Beaverton segment of the Trail of Two Cities. It will connect the existing trail at Croll Road in Tobacco Township along Porter Street to the existing sidewalk and boat launch on Porter Street.

2014 Trail of Two Cities Master Plan

Request for Proposal - Bid Ad

August 28th, 2025

Letter to Residents

December 20th, 2023

Overview

  • Grant: SPARKS

  • Anticipated Completion: 2026

  • Project Engineer: MLR Engineering

    Project Status

    rev. 7/16/26
    • Lighting installed

    • Next: will install fencing at the pocket park and place a kayak launch

    Documents