Trail of Two Cities
This project began with a vision and a Master Plan in 2014 and involves the construction of the Beaverton segment of the Trail of Two Cities. It will connect the existing trail at Croll Road in Tobacco Township along Porter Street to the existing sidewalk and boat launch on Porter Street.
Overview
-
Grant: SPARKS
-
Anticipated Completion: 2026
-
Project Engineer: MLR Engineering
-
Project Status
rev. 7/16/26
-
Lighting installed
-
Next: will install fencing at the pocket park and place a kayak launch


